Skip to content
CT Tech NepalDigital Engineering
All case studies
EnterpriseHimalayan Freight Co. · 2025

A unified logistics control tower for 42 branch offices

Consolidated dispatch, customs paperwork, and fleet tracking into a single operations platform replacing 12 spreadsheets.

-68%
Dispatch admin time
-91%
Documentation errors
42
Branches onboarded
Abstract cover artwork for the Himalayan Freight Co. case study

The problem

Himalayan Freight was coordinating 340 vehicles across 42 branches using WhatsApp groups and per-branch spreadsheets. Dispatch data arrived hours late, customs documentation was frequently incomplete, and management had no reliable view of margin per route.

Technical execution

  1. 01Mapped 27 operational workflows across six branch types over a three-week discovery
  2. 02Built a real-time dispatch board with automatic driver assignment and conflict detection
  3. 03Digitised customs and waybill documentation with validation before submission
  4. 04Added a margin analytics layer reconciling fuel, tolls, and detention charges per trip

Client impact

-68%

Dispatch admin time

-91%

Documentation errors

42

Branches onboarded

Delivered on schedule with full repository and infrastructure handover to the client's internal engineering team.

Bring us the problem. We will bring the plan.

Tell us where your operations slow down. In one call we will map the likely causes, the technical options, and what a realistic first phase looks like — no obligation, no sales script.

Usually within 24 hours

Weekday inquiries get a same-day response from an engineer, not a bot.

Talk to the people who build

No account managers relaying questions. Straight to the team.

Studio phone

+977-1-5970000